Research factsheet28 September 2026
Download PDF
FMETAIMXFulcrum Metals PLC
Interim Results for the six months to 30 June 2026 · RNS 4511W · 28 September 2026

Fulcrum interims: pilot and first Teck-Hughes programme funded, but cash cushion over Yorkville debt is thin

Share price5.7p
Market cap£9.09m
52-week range5.3p – 13.5p
Shares in issue159.5m
12-month change-13.5%
Ticker Data API, as at 3 Nov 2026, 15:13

Share price, 12 months

6p8p10p12p Announcement, 28 September 2026Dec 25Feb 26Apr 26Jun 26Aug 26Oct 26

Summary

Fulcrum Metals' interim results today say its 2.4 tonnes-per-day cyanide-free pilot and first Teck-Hughes programme are funded from the first £2.5 million Yorkville loan tranche and a £500,000 equity subscription. The first-half loss widened to £647,532 and June cash stood at £2,731,870. The pilot site in the Greater Toronto Area is not yet secured. Most of the operational news was already public: the 78% laboratory gold recovery, the TDI pilot agreement and the conditional US$20 million Chancery royalty term sheet. What the accounts add is detail on the funding. The convertible loan is being repaid monthly and is due within twelve months unless converted. Share issuance continues, most recently at 7 pence.

Key figures

FigureValuePeriodChange
Cash and cash equivalents£2,731,87030 June 2026£281,889 at 31 December 2025
Loss for the period£647,532H1 2026£375,019 in H1 2025
Net cash used in operating activities£960,475H1 2026£172,001 in H1 2025
Cash spent acquiring exploration assets£725,584H1 2026£269,973 in H1 2025
Convertible loan notes (current liability)£2,061,34830 June 2026Nil at 31 December 2025
Net current assets£598,02930 June 2026£10,623 at 31 December 2025
Teck-Hughes Phase 3 laboratory gold recovery78%H1 202631% relative improvement on Phase 1
Shares in issue153,624,69230 June 2026124,512,212 at 31 December 2025
Warrants outstanding27,830,19130 June 2026Weighted-average exercise price £0.08
Market capitalisation£11mShare price 7.25p
Sources: Interim Results RNS, 28 Sep 2026; Ticker company data

The announcement

Against guidance

On the technical side, delivery has beaten earlier targets. In September 2024 the company said it was aiming for gold recovery above 60%, after Phase 1 results of up to 59%. Laboratory testing has now reached 78%. The 2025 conceptual study's sensitivity case assumed 74% recovery, so laboratory results now exceed that assumption, but they are not yet proven at pilot scale. On funding, the statement that the pilot is funded is new, but it comes without an itemised pilot budget, a commissioning date or the monthly Yorkville repayment schedule. The directors report no material going-concern uncertainty, compared with material uncertainties in the 2023 and 2024 accounts.

Bull case

  • Laboratory gold recovery has risen from about 59% to 78%, alongside strong silver and tellurium recoveries. The pilot is backed by TDI, Extrakt and Bechtel, and long-lead equipment is on order.
  • If the pilot succeeds, it could unlock the proposed US$20 million Chancery royalty financing. That would provide project-level capital without an ownership transfer or new shares, although it would cost a 5% net smelter return royalty.
  • Beyond Teck-Hughes and Sylvanite (a historical estimate of 10.7 million tonnes of tailings, still to be verified), Fulcrum's exclusive Extrakt rights cover more than 70 documented legacy mine-waste sites in districts that have produced more than 110 million ounces of gold.
  • Part of the roughly £11m market value is backed by £1,834,971 of listed investments, plus pending Loyalist and Terra North consideration.

Bear case

  • The cushion over the debt is thin. June cash of £2,731,870 sits only modestly above the £2.5 million face value of the Yorkville loan, which is repaid monthly. The conversion price of £0.11375 is well above the share price, so repayments are likely to be met from cash or share sales.
  • Cash use is rising. Operating and exploration outflows totalled £1,686,059 in the half, so cash covers less than a year at that rate, before any rise in pilot spending. The at-the-market facility (which lets the company sell new shares directly into the market) can only be used to prepay the loan, not to fund the pilot.
  • Dilution has been persistent. Shares in issue rose from 124,512,212 to 153,624,692 in six months, and issue prices have fallen from 11p in March to 7p in September. Daily trading is thin, so further share sales could weigh on the price.
  • The core claims are still unproven: the pilot site is not secured, the pilot has not run, no compliant resource exists and the Chancery term sheet is non-binding. The £4,350,059 of capitalised exploration assets depends on commercial viability being shown.

What to watch

This research is produced by Ticker using automated analysis of company announcements, filings and market data. It is for information only, is not personal advice or a recommendation to buy or sell any security, and may contain errors. Past performance is not a reliable indicator of future results. The value of investments can fall as well as rise. Market data from Ticker's Data API as at 3 Nov 2026, 15:13.